- Track your orders
- Save your details for express checkout
No
For stormwater choose a Drainage Pump, for sewage effluent choose a Vortex Pump or a Cutter and Grinder Pump.
This depends on the head - a combination of the pipe diameter, distance to be pumped and how much it rises over the distance. So the calculate the total head we add the vertical (static) head to the horizontal head. To calculate the horizontal head, for every 100 metres distance, add 2.5 metres of head. So if it is 20 metres horizontally, the add 0.5 metres to the static head.
Selection process example:
Total head then becomes 3 metres plus 1.25 metres = 4.25 metres
Then proceed to select the pump (drainage or sewage) that has a maximum head capability of a least 7 metres (to provide a reasonable extra capacity).
Yes
It is not mandatory but recommended.
Yes, between 1 and 2 years